Holiday Inn Express

Location:2240 Hilltop Drive • Redding CA 96002

Upcoming events

  • 08/27/2019 8:30 AM - 08/27/2019 3:30 PM

    Capital Improvement Plans

    For any water utility, even a very small water system, the management of assets (i.e., water tanks, pumps, computers, buildings etc.) plays a significant role in the overall financial performance and the sustainability of the water system. With proper planning, emergencies can be avoided and overall costs will be reduced.  

     

    A Capital Improvement Plan prioritizes the replacement or installation of infrastructure assets. It includes the forecasting and budgeting of capital outlay and is an integral part of the budgeting and rate-setting process for even very small water systems.

     

    This workshop qualifies for 0.6 CEUs.

     

    Workshop agenda:

    • What is a CIP
    • Why does a water system need a CIP
    • 8 Elements of a CIP
    • 9 Criteria for Prioritizing
    • Updating a CIP
    • RCAC’s CIP Model

    Register online at: https://www.events.rcac.org/assnfe/ev.asp?ID=1850

     

    For registration questions, contact:

    registration@rcac.org • (916) 447-9832;1429

    For more information regarding workshop content, contact: Katrina Hiott at khiott@rcac.org(916) 447-9832 ext. 1088

     

Bookmark the permalink.

Comments are closed.